Toshiba TOSVERT VF-AS3 Instruction Manual page 54

High-performance industrial inverter for 3-phase motors, 3-phase 240v class 0.4 to 55kw, 3-phase 480v class 0.4 to 280kw
Hide thumbs Also See for TOSVERT VF-AS3:
Table of Contents

Advertisement

4
Remove the wiring duct from the unit by pulling it
down.
2
5
Mount Wiring duct and Duct cover in the reverse pro-
cedure.
First, insert the upper right part of the wiring duct to the
unit. See the figure in step 4.
Be sure to mount the wiring duct before the transpar-
ent cover.
9
■ DC reactor cover
1
Remove four screws of the DC reactor cover.
Store the removed screws so as not to be lost.
2
Lift the lower end of the DC reactor cover slightly and
remove it from the unit by pulling down.
The upper side of the DC reactor cover is to be
inserted.
3
Mount the DC reactor cover in the reverse procedure.
2. Installation and wiring
pulling
down
2-20
E6582062
Wiring duct and
Duct cover
DC reactor cover
Screw
DC reactor cover