Installation - Siemens SINAMICS S120 Manual

Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Option boards
5.4 Communication Board Ethernet CBE20
Table 5-10
Meaning of the OPT LED on the Control Unit
LED
Color
OPT
Green
Red
Orange
5.4.4

Installation

1. Release the appropriate screws to remove the cover plate from the option slot.
2. Insert the module into the option slot of the Control Unit and fix it in place using the screws.
Screws: M3
Tool: Torx T10 screwdriver
Tightening torque: 0.8 Nm (7.1 lbf in)
104
Status
Description, cause
OFF
The electronics power supply is missing or outside the permis‐
sible tolerance range.
CBE20 either defective or not inserted.
Continu‐
CBE20 is ready and cyclic communication is taking place.
ous light
Flashing
CBE20 is ready but cyclic communication is not running.
light
Possible causes:
0.5 Hz
Communication is being established.
At least one fault is present.
Continu‐
Cyclic communication via PROFINET has not yet been estab‐
ous light
lished. However, non-cyclic communications are possible. SI‐
NAMICS is waiting for a parameterization/configuration tele‐
gram.
Flashing
The firmware update into the CBE20 has been completed with
light
an error.
0.5 Hz
Possible causes:
The memory card for the control unit is defective.
The CBE20 is defective.
In this state CBE20 cannot be used.
Flashing
There is a communications error between the Control Unit and
light
the CBE20.
2 Hz
Possible causes:
The CBE20 was withdrawn after booting.
The CBE20 is defective.
Flashing
Firmware of the CBE20 currently being updated.
light
0.5 Hz
Remedy
Replace the memory
card or the CBE20.
Correctly insert the
board, if required, re‐
place.
Control Units and additional system components
Equipment Manual, 06/2020, 6SL3097-5AH00-0BP2

Advertisement

Table of Contents
loading

This manual is also suitable for:

6sl3055-0aa00-5ea

Table of Contents