Figure 75 Aligning The Pe1 And Ilp Using The Parallel Jig - HP Indigo Division Series Instruction For Use & Installation Instructions

Table of Contents

Advertisement

At the ILP feed
i.
While one person places a leveler on the idler No. 3 (Figure 75), and then idler No. 10
(Figure 63), another person should adjust the pull/push screws at the feed and exit of
the rear lower frame:
i.
ii.
iii.
Repeat until the ILP are sitting firmly on the floor and the ILP is level.
Measure the level to an accuracy of 0.0±0.1 mm.
j.
Tighten the six leveling screws until just tight.
Then turn the adjustment nuts one further complete turn and tighten the locking nuts.
At the ILP exit
k.
Repeat step g above, placing a leveler on the idler No. 10 (Figure 63), and adjust the
two feet 20 mm height adjustment nuts until accurately leveled.
Measure the level to an accuracy of 0.0±0.1 mm.
l.
Tighten the six leveling screws until just tight and
Then turn the adjustment nuts one further complete turn and tighten the locking nuts.
10.
Configure the parallel jig for the long configuration. Refer to the section General information
on page 17.

Figure 75 Aligning the PE1 and ILP using the Parallel jig

1
ILP
2
Parallel jig
3
ILP idler No. 10
At the ILP exit and PE1 feed
11.
To align the ILP using the parallel jig:
a.
Remove the two screws securing the IR sensor bracket.
Save the screws for later reinstallation.
Carefully place the bracket and sensor aside. Do not disconnect its cable.
Turn the push screw counterclockwise to release the internal frame.
Turn the pull screw to adjust the skew of the ILP frame until leveled.
Tighten the push screw to accurately align the ILP.
4
PE1 driver roller
4
PE1
CA294-03070 rev 00
Installation Manual
page 93 of 153

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W3250

Table of Contents