Figure 11 Setting up the surveying tool
1
Position of surveying tool
2
Surveying line
NOTE:
The surveying tool is setup on its tripod in accordance with
its instruction manual at the position shown in Figure 11.
h.
Raise the height of the tripod and surveying tool to 1550.0 mm.
1
2
CA294-03070 rev 00
Installation Manual
page 29 of 153