Upper Transmit Bank - Pin 6 Vias (3) - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

PROPRIETARY TO GE
D
5180483-100, R
. 7
LOGIQ E9 P
S
M
IRECTION
EV
ROPRIETARY
ERVICE
ANUAL
7-9-19-7
Visual Inspection of Board (cont'd)
Troubleshooting Step 2 - Upper and Lower Transmit Bank (cont'd)
With a calibrated ohm meter, measure from the pin 6 via of each transmit transformer to ground.
1.) Place the negative lead of the meter on board ground.
2.) Place the positive lead of the meter on the pin 6 via of the transmit transformer.
A good transmit channel should read close to zero ohms. Typically five ohms or less, with a calibrated
ohm meter.
A defective transmit channel will have a significantly higher reading. Typically in the mega-ohms or the
reading simply will not settle to a distinct level.
Repeat steps for each transmit transformer on each GTX board until the defective channel is identified
Figure 7-197 Upper Transmit Bank - Pin 6 Vias (3)
Chapter 7 Diagnostics/Troubleshooting
7 - 293

Advertisement

Table of Contents
loading

Table of Contents