Installation; Receipt Of Relays; Relay Mounting; Flush Mounting - Toshiba GRE110 Instruction Manual

Overcurrent protection relay
Table of Contents

Advertisement

5. Installation

5.1 Receipt of Relays

When relays are received, carry out the acceptance inspection immediately. In particular, check for
damage during transportation, and if any is found, contact the vendor.
Always store the relays in a clean, dry environment.

5.2 Relay Mounting

The relay case is designed for flush mounting using two mounting attachment kits.
Appendix F shows the case outlines.
This attachment kits can be mounted on the panel thickness of 1-2.5mm when the included screws
M4x8 are used. When mounted on the panel thickness of 2.5-4.5mm, M4x10 screws and some
washers should be used.

5.2.1 Flush Mounting

For flush mounting the panel cut-out;
・Mount the case in the panel cut-out from front of panel. ; See Fig.5.2.2.
・Use the mounting attachment kits set ; See Fig.5.2.3.
・Tighten the M4 screw of the attachment kits ; see Fig.5.2.4.
The allowed range for the fixing screws' tightening torque is 1.0...1.4Nm.
Do not tighten the screws too tightly.
127
117
Fig. 5.2.1 Outline of attachment kit
 153 
6 F 2 T 0 1 7 2
13
5