Hitachi CHROMASTER 5160 Instruction Manual page 839

Table of Contents

Advertisement

Syringe valve
4
Plunger
wash
Syringe
Wash
fluid1
(8)
Buffer tube
3
2
1
5
Wash pump
P
3-way solenoid valve
Degassing
unit
Wash
fluid2
Refer to 2.3.3 Sample Injection Procedure, Cut Injection Method
Procedure (9) to (12) for completion of the analysis after this
operation.
Sample injection (INJECT switch)
Switch the injection valve to the INJECT side to load the
sample into the flow path.
Move the syringe to the top dead point after switching the
injection valve.
Injection valve
5
Loop
6
Waste
1
solution
From Pump To Column
2 - 43
Needle
Injection port
4
3
Waste
2
solution
Wash port
Rack
Sample

Advertisement

Table of Contents
loading

Table of Contents