10. Remove the two screws, and remove the shaft holder.
11. Form the flexible flat cable straight as shown in the
figure.
2-2
Flexible flat cable
Shaft holder
PSW
2 x 6
12. Remove the four screws, and remove the bearing
holder T and two ball bearings.
Ball bearing
PSW2.6 x 6
PSW2.6 x 6
Bearing holder T
Ball bearing
BRC-300/300P
BRU-300/300P