Installation - Suzuki SQ416 Service Manual

Volume 1 of 2 chassis/electrical/body
Hide thumbs Also See for SQ416:
Table of Contents

Advertisement

INSTALLATION

Reverse removal sequence to install condenser, noting following
point.
1) When replacing condenser, add 20 to 30 cc of refrigerating oil
from compressor suction-side.
2) Evacuate and charge system according to previously-described
procedure.
RECEIVER/DRYER (IF RECEIVER/DRYER IS
INDEPEND OF CONDENSER)
INSPECTION
Use a leak tester to check for gas leakage, sight glass and fittings.
REMOVAL
1) Recover refrigerant by using recovery and recycling equipment.
Be sure to follow the instruction manual for the equipment.
The amount of compressor oil removed must be measured and
the same amount must be added to the system when reinstal-
ling.
2) Disconnect liquid line pipes.
3) Remove receiver/dryer from its holder.
1. Receiver / dryer
2. Liquid line pipe
INSTALLATION
1) Reverse removal sequence to install receiver/dryer.
NOTE:
D When replacing receiver/dryer, add 10 cc of refrigerating
oil from compressor suction-side.
D Blind plugs of receiver/dryer should not be removed until
just before receiver/dryer is installed.
2) Evacuate and charge system according to previously-described
procedure.
AIR CONDITIONING (OPTIONAL) 1B-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sq625Sq420

Table of Contents