Suzuki SQ416 Service Manual page 726

Volume 1 of 2 chassis/electrical/body
Hide thumbs Also See for SQ416:
Table of Contents

Advertisement

Service Bulletin
POWER STEERING (P/S) SYSTEM
SUBJECT: P/S GEAR BOX RACK BOOT SERVICE PROCEDURE
Removal and installation of rack boot for P/S gear box with "NPSK" ID label
IDENTIFICATION
The boot for the "NPSK" labeled P/S gear box can be identified by the manufacture's logo "NDK".
Do not mix up the above boot with one whose logo is "TRW Koyo" as there is no interchangeability between them.
Make marking here
1. Clip
2. Wire
SECTION 3B1
REMOVAL
1) Remove steering gear box by referring to POWER STEERING
GEAR BOX ASSEMBLY REMOVAL.
2) For ease of adjustment after installation, make marking of tie-rod
end lock nut position of tie-rod end thread.
3) Loosen tie-rod end lock nut and remove tie-rod end.
4) Remove boot wire and clip.
5) Remove boot from tie-rod.
POWER STEERING (P / S) SYSTEM 3B1-1
1. Boot
2. Wire
3. Clip
4. ID label ("NPSK" logo)
5. Flange
6. Embossed "NDK" logo

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sq625Sq420

Table of Contents