Suzuki SQ416 Service Manual page 727

Volume 1 of 2 chassis/electrical/body
Hide thumbs Also See for SQ416:
Table of Contents

Advertisement

3B1-2 POWER STEERING (P / S) SYSTEM
1. Tie-rod
2. Mark
3. Lock nut
4. Tie rod end
5. Knuckle
6. Nut
INSTALLATION
1) Visually inspect that rack and rack end ball joint are free from dirt
or foreign matters. Clean thoroughly with cloth or such.
Position boot properly in grooves of gear case and tie-rod and
clamp it with wire and clip.
Wire should be new and should go around twice.
Pull its both ends together by screw driver or such and make
sure that the wire won't be crossed. Then twist the ends several
times, the twisted ends should be bent in the circumferential
direction.
After this, check to ensure that wire is tight and boot is free from
twist and dent.
2) Install tie-rod end lock nut and tie-rod end to tie-rod.
Position lock nut to the mark made in removal.
3) Install steering gear box assembly by referring POWER
STEERING GEAR BOX ASSEMBLY INSTALLATION.
After installation, fill specified P/S fluid and bleed air from sys-
tem. Then check toe setting and adjust as required.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sq625Sq420

Table of Contents