Recommended Spare Parts; Periodic Maintenance Tasks; Periodic Inspections; Consumables Replacement Schedule - GE Sievers Innovox Operation And Maintenance Manual

Toc analyzer
Hide thumbs Also See for Sievers Innovox:
Table of Contents

Advertisement

Chapter 8: Maintenance
Description
Pinch valve tubing
Reactor peristaltic pump tubing
High-pressure valve seals
Exterior sample pumps tubing (optional equipment)
NDIR aerosol filter
Sample/reagent peristaltic pump tubing
Syringe lubrication
Carrier Gas CO
Scrubber cartridge (optional equipment)
2
Norprene Chemical waste tubing
1.
Application dependent.

Recommended Spare Parts

GEAI recommends that you have available spare seals for the high-pressure valves, reagent peristaltic pump
head, pinch tubing, waste tubing, and NDIR pre-filter. To order spare parts in North America, contact GEAI Order
Entry at 303.444.2009 or 800.255.6964. In Europe, Middle East, and Africa (EMEA), contact us at +44 (0) 161 864
6800 and in Asia Pacific, contact us at (8621) 38777735. Technical support in North America is available at
303.444-2009 or 888.245.2595 or TechSupport.GEAI@ge.com. Technical support in Europe, Middle East, and
Africa is available at 44 (0) 161 864 6800 or ServiceUK.Instruments@ge.com. Technical support in Asia Pacific is
available at (65) 62674659 or
Analytical instruments representative. You can also visit the Support tab on our website at
www.geinstruments.com. Installation and training by a qualified service technician can also be provided.

Periodic Maintenance Tasks

Periodic Inspections

To ensure optimum performance of the Analyzer, inspect the following items periodically.
1.
Reagent levels. Inspect the reagent and dilution water containers to ensure that there is adequate
acid, oxidizer, and dilution water to perform the analyses
according to the directions in the following section.
2.
Check Standard level. Inspect the Check Standard carboy to ensure that there is adequate solution to
perform the analyses
11.
This inspection is automatically performed by the Analyzer if the Fail Safe accessory is installed and
activated.
GE Analytical Instruments ©2016
Table 14: Consumables Replacement Schedule
TechSupportSG.GEAI@ge.com
11
.
178 of 270
Typical Operating Life
3 months of operation
3 months of operation
1
1 month of operation
3 months of operation
3 months of operation
3 months of operation
3 months of operation
3 months of operation
6 months of operation
.  
In other parts of the world, contact your local GE
11
. Prepare the reagents, if necessary,
DLM 68100-09 EN Rev. A

Advertisement

Table of Contents
loading

Table of Contents