Husqvarna DXR 95 Operator's Manual page 61

Table of Contents

Advertisement

Available languages

Available languages

Position
Movement
10
Arm 1 and 2 in.
11
Arm 1 in.
12
Arm 2 out.
13
Rotate the tower counterclockwise.
14
Rotate the tower clockwise.
Work mode or transport mode and crawl selected, with
dig mode engaged:
3
Position
Movement
1
Arm 1 out.
2
Arm 1 in.
3
Tool in. The function also operates when the right top button is pushed down. Arm 1 and 2 can be
operated in parallel and when you move the tool when the right top button is pushed down.
4
Tool out. The function also operates when the right top button is pushed down. Arm 1 and 2 can be
operated in parallel and when you move the tool when the right top button is pushed down.
5
Arm 2 in.
6
Arm 2 out.
7
Arm 3 up.
8
Arm 3 down.
9
Arm 1 and 2 out.
10
Arm 1 and 2 in.
11
Rotate the tower counterclockwise.
12
Rotate the tower clockwise.
1401 - 005 - 11.01.2024
1
4
2
7
5
9
11
13
6
10
8
12
14
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr 145Dxr 275Dxr 305Dxr 315

Table of Contents