Preparation For The Work - Yamaha SIGMA-G5SII Service Information

Table of Contents

Advertisement

4.11.3. Preparation for the Work

(1) Select "Setup", "NOZ.CHG", "Nozzle Change", "Select Head" and "Move" in this
order and press the [START] button in the "Operation" window.
For the head to be disassembled and lubricated, fifteen nozzles are attached.
* Any type of nozzle can be attached.
(2) Select "Maint.", "Ship Adj.", "Noz Lv/Pos", "Select Head", "Noz Lv" and "Teach
Start" in this order and press the [START] button in the "Teaching" window.
When the teaching is completed, select "Save". When a message "Do you save it?"
appears, select "Yes" to save the teaching data.
(3) Select "Setup", "NOZ.CHG", "Nozzle Reset", "Head Select" and "Operation" in this
order and press the [START] button in the "Operation" window.
When the nozzle has been housed in the stocker, remove the feeder cart to facilitate
the operation.
(4) Turn OFF the power and air to the machine.
(5) Remove the head cover.
Service Information
Fig.D65
Fig.D66
SI1705004E-00=SIGMA-G5SII Service Manual
155/273
For Service Engineer

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents