32/64
Assembly
Required accessories
• Position monitoring kit for
HQ 2/C-H 3 842 552 649
• Position monitoring kit for
HQ 4 3 842 535 726
• Proximity switch IEC/
EN 60947-5-2-2004,
3 842 537 995.
1.
Install the switch bracket
on the lift transverse unit.
2.
Install the switching
element.
– 3 842 549 569 for
HQ 2/C-H.
– 3 842 532 554 for
HQ 4.
3.
Install the proximity
switch* and confi gure
the switching distance.
4.
Confi gure the switching
element according to
the switching position
(central transverse
conveyor position cycle).
Bosch Rexroth AG, Material and information fl ow technology: HQ 2/C-H, HQ 4, 3 842 358 792/2016-12
7.6.10
Installing the position monitoring kit
3
+0,5
1
mm
2
3 3
Fig. 17:
Installing
the position monitoring kit (HQ 2/C-H shown here as an example)
SW13
4
1
SW5
1
2
2
1
30
551 261-17