Operation
1
Initial situation
3
Push the left-hand control gate to the left.
5
Remove the operating lever for the DISCONNECTING function.
The interrogation lever and the left-hand control gate return to their initial
position.
164/214
37.2

Switching operations in the bus sectionalizer panel

Coupling busbar sections
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
2
Push the interrogation lever downwards.
4
Switch the left-hand three-position disconnector to CLOSED position
(insert the operating lever for the DISCONNECTING function and turn
180° clockwise).
6
Push the right-hand control gate to the left.