Siemens 8DA10 Series Installation And Operating Instructions Manual page 170

Medium-voltage switchgear
Hide thumbs Also See for 8DA10 Series:
Table of Contents

Advertisement

Operation
1
Initial situation
3
Push the right-hand control gate to the right.
5
Remove the operating lever for the READY-TO-EARTH function.
The interrogation lever and the right-hand control gate return to their
initial position.
170/214
De-earthing the busbar section in the left-hand panel
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
2
Open the circuit-breaker to de-earth the busbar section in the left-
hand panel.
4
Switch the right-hand three-position disconnector to OPEN position
(insert the operating lever for the READY-TO-EARTH function and turn
180° counter-clockwise).
6
Push the interrogation lever downwards.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents