Commissioning
5.1 Commissioning with SENTRON powerconfig app
During commissioning, the devices display different statuses on the LEDs; these were
explained in the Chapter LED signaling of the SENTRON circuit protection devices (Page 37).
Upon completion of the commissioning process, all LEDs should be static green, i.e. the
commutative circuit protection devices are fully functional.
1. Adding the
7KN Powercenter 1000
(Bluetooth or Ether-
net)
42
2. Adding and pairing
the communicative
circuit protection de-
vices
⇒
3. Display and parame-
terization of the con-
nected devices
⇒
Circuit protection devices with communication and metering function
System Manual, 06/2021, L1V30827018B-01
4. Visualization of the
recorded values
⇒