Removing The Server And Guide Rails; Removing The Server And L-Shaped Guide Rails - Huawei 2288H V5 User Manual

Table of Contents

Advertisement

2288H V5 Server
User Guide
l
l

3.3 Removing the Server and Guide Rails

3.3.1 Removing the Server and L-Shaped Guide Rails

Step 1 Wear an ESD wrist strap. For details, see
Step 2 Power off the server. For details, see
Issue 04 (2018-09-04)
The Power Control page is displayed.
c.
Click Power Off or Forced Power Off. In the displayed dialog box, click Yes to
power off the server.
NOTICE
A forced power-off may cause data loss or program damage. Forcibly power off the
server only when necessary.
Power off the server using the Remote Virtual Console.
a.
Log in to the Remote Virtual Console. For details, see
Remote Virtual
Console.
b.
On the KVM screen, click
c.
Choose Power Off or Forced Power Off.
A dialog box is displayed.
NOTICE
A forced power-off may cause data loss or program damage. Forcibly power off the
server only when necessary.
d.
Click Yes to power off the server.
Power off the server using the iBMC CLI.
a.
Log in to the iBMC CLI. For details, see
b.
On the iBMC CLI, run the ipmcset -d powerstate -v 0 command to power off the
server or the ipmcset -d powerstate -v 2 command to forcibly power it off.
NOTICE
A forced power-off may cause data loss or program damage. Forcibly power off the
server only when necessary.
c.
Enter y or Y to power off the server.
Copyright © Huawei Technologies Co., Ltd.
or
on the menu bar.
14.3 Logging In to the iBMC
12 Preventing Electrostatic
3.2 Powering Off the
Server.
3 Basic Operations
14.2 Logging In to the
CLI.
Discharge.
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents