Verifying Cable Connections; Initial Configuration - Huawei 2288H V5 User Manual

Table of Contents

Advertisement

2288H V5 Server
User Guide
Figure 4-25 Connecting cables to a DC PSU
Step 3 Connect the other end of each cable to the corresponding PDU by observing the power cable
connection rules.
Step 4 Bind the power cable to the cable trough using cable ties.
----End

4.5.9 Verifying Cable Connections

Before verifying cable connections, check that the power is cut off. Otherwise, any incorrect
connection or loose connection may cause human injury or device damage.
Check cable connections against
Table 4-3 Cable connection checklist
Item
Power cable
Network cable
Ground cable

4.6 Initial Configuration

Issue 04 (2018-09-04)
CAUTION
Description
Power cables are correctly connected to the rear of the chassis.
Network cables are connected correctly to the management port or
service ports on the rear panel of the chassis.
The 2288H V5 server does not provide a separate ground port.
l In an AC or HVDC environment, the power cables of AC PSUs are
grounded. Ensure that the power cables are in good contact.
l In a DC environment, the ground terminals of DC PSUs are
grounded. Ensure that the ground cables are in good contact.
Copyright © Huawei Technologies Co., Ltd.
Table
4-3.
4 Setup
92

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents