HP 5890 SERIES II Service Manual page 56

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

22. Remove the two screws securing the fitting housing to the proportional control. (This will free
the valve transducer brazement from the proportional control valve.)
23. Remove the four screws securing the inlet bypass clamp to the proportional control valve.
24. Replace any damaged or suspect components (particularly o- rings).
When connecting lines and fittings, ensure that all o- rings are properly installed.
25. Assemble the EPC components in the reverse order of disassembly.
26. Restore all gas supplies.
27. Leak check all installed fittings.
28. If the system is leak- free, install the left side panel and secure using two screws.
29. Restore power to the instrument.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
SCREWS
VALVE
TRANSDUCER
BRAZEMENT
O- RING
PROPORTIONAL
CONTROL VALVE
RESTRICTOR
O- RING
RESTRICTOR
PCOC INLET BRAZEMENT
INLET BYPASS
CLAMP
SCREW
SVC 3- 13
FITTING
HOUSING
O- RING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents