HP 5890 SERIES II Service Manual page 53

Gas chromatograph
Hide thumbs Also See for 5890 SERIES II:
Table of Contents

Advertisement

23. Gently pull on the wire to ensure that the pin is locked in the connector.
24. Insert connector P8 into its receptacle by pressing it straight in until it bottoms.
When connecting lines and fittings, ensure that all o- rings are properly installed.
25. Connect the plumbing to the new valve.
26. Restore gas supplies to the instrument.
27. Check for leakage at all installed fittings.
28. If the system is leak- free, verify operation of the split/splitless system by operating the solenoid
valve via the keyboard.
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
SVC 3- 10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents