Download Print this page

Huawei PDC-0091V2ACIOA Quick Installation Manual page 6

Advertisement

Method 2: Adjustable guide rails (optional) + Floating nuts
A. Fix the position of the guide rails (2 U) on the rack align the lower edge of a guide rail with the lower edge
of a U scale.
B. Engage the mounting brackets on both ends of the guide rail into the mounting holes, and then secure the
back end of the guide rail with M6 x 16 panel screws. Do not install panel screws on the front end of the
guide rail. Use the same method to install the other guide rail.
C. Install floating nuts in the upper part of the guide rails (front side) on both sides. The following figure shows
the installation positions.
The guide rail on the right has the R silkscreen, and the guide rail on the left has the L silkscreen. Do not install them
reversely.
The
The
guide rail
guide rail
on the
on the
left
right
Guide rails are optional and recommended for rack installation. For a 3 U device, install guide rails and two floating nuts.
Secure the device with screws. The floating nuts are delivered with the rack.
Floating nut
5
2 U
Lower edge
of a U scale

Advertisement

loading

This manual is also suitable for:

V100r001