Power-On Procedure - Huawei PDC-0091V2ACIOA Quick Installation Manual

Advertisement

No.
Item
Maintenance
7
bypass port
cable
CAN
8
communications
port cable
Mapping between cable connectors for CAN communications ports
 Connecting cables to the PDU for a 1+1 UPS2000-G-15 kVA/20 kVA parallel system (Three-phase input single-phase
output and Two Mains Input)
MBS is short for maintenance bypass switch.
Connect cables from bottom to top: Install cables for devices at the bottom and then devices on the top. When connecting
cables to one device, connect those at the bottom first and then those on the top.
Install the battery pack front panel after cables are properly connected.

3. Power-On Procedure

For details, see the UPS2000-G-(6 kVA–10 kVA) V100R001 Quick Installation Guide and UPS2000-G-(15 kVA–20 kVA)
V100R001 Quick Installation Guide.
Appearance
9
8
7
6
1
18
Specifications
RVV 4 x 0.5
SBYV-100 4 x 2 x 0.5
5
2
3
Remarks
Prepared onsite
(connectors
provided)
Prepared onsite
4

Advertisement

loading

This manual is also suitable for:

V100r001