Connecting cables to the PDU for a 1+1 or 2+0 UPS2000-G-6 kVA/10 kVA parallel system (single-phase input single-
phase output)
 Torque for tightening power cables
Device
UPS2000-G-6 kVA
UPS2000-G-10 kVA
PDU
 Cable list
1. The table lists only the cables directly connected to the PDU. For details about other cables and cable types, see
the installation guides for related devices.
2. Configure colors for the cables prepared onsite in accordance with the local regulations.
3. If customers purchase input and output power cables by themselves, use the cables that comply with standards
proposed by Underwriters Laboratories (UL) or International Electrotechnical Commission (IEC).
4. Connect cables in this sequence: cables between PDU and AC output power, cables between PDU and AC input
power cables, and then cables between PDU and UPSs.
No.
Item
PDU AC output
1
power cable
PDU bypass
2
input power
cable
PDU UPS 1 AC
3
input power
cable
PDU UPS 1 AC
4
output power
cable
PDU UPS 2 AC
5
input power
cable
PDU UPS 2 AC
6
output power
cable
Tool
Torque
screwdriver
Appearance
Screw
Torque
M4 x 0.7p
1.3 N· m
M5 x 0.8p
1.5 N· m
M5 x 0.8p
1.5 N· m
Specifications
6 mm² (1+1 UPS2000-G-6
kVA parallel system)/10
mm² (1+1 UPS2000-G-10
kVA parallel system)
16 mm² (2+0 UPS2000-G-6
kVA parallel system)/16
mm² (2+0 UPS2000-G-10
kVA parallel system)
6 mm² (1+1 UPS2000-G-6
kVA parallel system)/10
mm² (1+1 UPS2000-G-10
kVA parallel system)
16 mm² (2+0 UPS2000-G-6
kVA parallel system)/16
mm² (2+0 UPS2000-G-10
kVA parallel system)
N/A
N/A
N/A
N/A
9
Remarks
Prepared onsite
Prepared onsite
1.
The cables is
delivered with
PDU, with a
part number of
04090674.
2.
The cables
connected to
6kVA UPS
should be cut
off the M6 OT
terminals, then
prepared on
site using the
M4 OT
terminals, with
a part number
of 14170017.