FusionCol8000-C210 In-room Chilled Water Smart
Cooling Product
User Manual (2022, Netherland GS)
2.
Figure 4-13 Securing the unit to the floor
Figure 4-14 Securing the unit to a base
4.3.6 Connecting Air Ducts
Procedure
Step 1 Remove the eight bolts from both sides of the equipment.
Issue 01 (2022-12-30)
Secure the anchor baffle plate to the bottom of the fan side using eight M6
screw assemblies.
NO TE
● If the air duct is not connected, seal the fan side.
● Obtain the anchor baffle plates according to the packing list.
NO TE
After the unit is secured, seal the base on the fan side.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation
46