iSitePower-M (MAP05A1, MAB05B1)
User Manual
Step 3 Route the cables out of the cable holes.
The outlet positions shown in the figure are for reference only. Select an
appropriate cable outlet based on the actual cable thickness.
Figure 7-25 Cable routes
Step 4 Tighten the screws.
Figure 7-26 Installing the decorative covers
----End
Issue 02 (2021-12-30)
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Electrical Connection
80