In the genset-grid hybrid scenario, the power system works circularly as follows.
The power source preference sequence is grid > battery > generator set (genset).
1.
2.
3.

5.4 Solar-Grid Hybrid Scenario

Figure 5-7 Solar-grid hybrid scenario network diagram (one product)
Issue 02 (2021-12-30)
If grid power is available, grid power is supplied to loads and charges
batteries if batteries are not fully charged.
If grid power is unavailable, batteries supply power to loads. When the
battery depth of discharge (DOD) reaches the specified value, the genset is
started.
When the batteries are fully charged or grid power is available, the genset is
shut down.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Application Scenarios
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents