Huawei IPE Series Installation Manual page 86

Table of Contents

Advertisement

IPE
Installation Guide
Installing the IPC on the Wall When Type-1 Bracket Is Used
Step 1 Determine the positions of installation holes based on the installation dimensions of the
bracket and mark the holes. Use a percussion drill bit with a diameter of 8 mm to drill four
holes that are 60 mm deep. Figure 8-1 shows the installation dimensions (in the unit of mm)
of the bracket.
Figure 8-1 Installation dimensions of the bracket
Step 2 Drive four expansion bolts into the holes.
Step 3 Align the dome IPC with the bracket. Mount the IPC on the bracket and rotate the IPC
clockwise so that the holes on the bracket are aligned with the screw holes on the installation
base of the IPC. Then, lock three screws between the bracket and the IPC, as shown in Figure
8-2.
Issue 03 (2013-02-28)
104
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
8 Installing an Infrared High Speed Do me IPC
102
79

Advertisement

Table of Contents
loading

Table of Contents