Figure 2.31 Leveling Test Before Fixing System - Samsung RRH-2WB Installation Manual

Mobile wimax/td-lte
Table of Contents

Advertisement

CHAPTER 2. Installing System
3) After fixing the equipment, place a spirit level on the side and top of the equipment, test the vertical/
horizontal leveling.
4) If the leveling result shows that the equipment is not placed in vertical/horizontal, check and adjust the
drilling location, connection materials' dimensions, and structures' dimensions and then make the
Measuring Horizontal
Measuring Vertical Position
2-32
Position

Figure 2.31 Leveling Test before Fixing System

© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents