Cable Routing For Line Connection Modules - Siemens SINAMICS S120 Manual

Modular motion control drive
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Electrical installation
4.4 Connections
4.4.11.2

Cable routing for Line Connection Modules

For the Line Connection Modules, the customer must carry out the following cabling or
connection work:
Table 4- 13
Cable routing
Cable for the line supply connection (L1, L2, L3, PE)
Signal cables
Notice:
The "Basic rules for cable routing" and "Preparatory steps" described above must
be observed whenever any cabling or connection work is performed!
90
Checklist for cabling or connection work for Line Connection Modules
Completed?
Cabinet Modules
Manual, (GH5), 05/2010, A5E03263538A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents