Configure Level 2 (And Up) Base Stations; Base Station Group Table, Synchronization Complete (Multi-Cell Screen); Base Station Group Table, Level 1 Complete (Multi-Cell Screen) - Toshiba IP4100 Installation Manual

Hide thumbs Also See for IP4100:
Table of Contents

Advertisement

MULTI-CELL SYSTEM SETUP
Figure 1-22 Base Station Group Table, Synchronization Complete (Multi-cell Screen)
Figure 1-23 Base Station Group Table, Level 1 Complete (Multi-cell Screen)
Configure Level 2 (and
Up) Base Stations
IP4100 Install Sept., 2013
source, there will be a warning in the DECT Chain for this base
station.
13. When the system has finished synchronizing, repeat this process for
each base station at Level 1.
1. Place the first Level 2 base station at its final location. (See the
Network Planning Guide for information on the proper placement of
base stations.)
2. Login to the base station.
3. Reset the base station to its default settings (open the Management
screen and click Default Base Station). If this base station has never
been configured, skip this step.

Configure Level 2 (and Up) Base Stations

1-27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents