Ac Power Check; Assemble Series 2000 Treadmill; Install Handle Set - GE Series 2000 Installation Instructions Manual

Hide thumbs Also See for Series 2000:
Table of Contents

Advertisement

AC Power Check

Equipment Assembly

Install Handle Set

2
Before beginning this installation, perform the AC line voltage test to verify the
wall outlet supplying power to the equipment is properly wired.
200 to 240 VAC, 50/60 Hz
Use a digital voltmeter, set to measure at least 300 VAC, to check the voltages of
the NEMA 6-20R, AC wall outlet (dedicated circuit recommended). If the
measurements are significantly out of range, have a qualified electrician repair
the outlet. The voltage measurements should be as follows:
1. 200 to 240 VAC between the two "hot" contacts.
HOT
NOTE
For proper and safe operation of the treadmill, ensure the power source is
clean.
The Series 2000 Treadmill ships completely assembled except for the handle set
and the emergency stop switch.
As recommended by the American Heart Association Exercise Standards
(Special Report, Vol 82, No 6), the treadmill should have front and side rails
installed for patients to steady themselves. An emergency stop switch must be
visible and readily accessible. Attach the handle set and emergency stop switch
BEFORE applying power to the unit.
1. If connected, disconnect the power cord from the rear connector panel.
2. Remove the screws on the shroud back and remove the back panel and
visually inspect the following:
a. Drive Belt
b. Motor Mount
c.
Harnasses
d. Elevation Rack
Series 2000 Treadmill
GROUND
HOT
002
2021403-028A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents