Flow Of The Preparations - Hitachi GS4000 Series Installation Manual

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

GS4000 Installation Guide Revision 4.00
2.1

FLOW OF THE PREPARATIONS

Hitachi can offer installation services, system setup, and the field technical assistance at
additional charge. For details, contact Hitachi in your region.
For the customer who prefers to install his own GS4000, Figure 2.1-1 below shows the flow of
GS4000 installation. Plan ahead so that the work for installing power supply, LAN cables, and
other communication equipment can be finished in time for the installation of the GS4000.
(1) What sort of and where the
switch should be used?
(2) Check environment where the
switch is to be placed.
(5) Prepare facility equipment
(6) Installation for power supply
and WAN/LAN cable setting
(8) Hitachi delivers the switch.
(9) Perform installation of switch.
(10) Setup configuration.
(11) Test system cooperation.
(12) Place router in service.
Figure 2.1-1
2-2
(4) Decide on an
installation layout.
(cables rack, etc.)
= Customer responsibility
= Vendor responsibility
Flow for the Preparations for Installing the GS4000
Unnecessary when you do not use
a leased line
(3) Apply for a leased line
(7) Line setup (done by carriers)
(Note 1)
Note 1: A device is handed over to the
(Note 2)
customers at the entrance.
Note 2: The task Hitachi can do for the
customers with charge.
(Note 3)
Note 3: Hitachi can preinstall the
configuration information in a device
before the shipment with charge. In this
(Note 4)
case, you should send the information
necessary to set a configuration to the
works in advance. For details, contact
Hitachi.
Note 4: Hitachi offers the service of the
field assistance for a test on system
cooperation and the trouble diagnosis as
well as the installation of a device with
charge.