Outfeeding From Longitudinal Conveyor (Tfe 1) - Bosch Rexroth HQ 5/H Assembly Instructions Manual

Table of Contents

Advertisement

17.1.3

Outfeeding from longitudinal conveyor (TFE 1)

Z4
S2
A1
Z1
S1
Schema4
Start pulse after end of start-up
Enable cyclic travel
S1
= WT after VE
S2
= WT in position on HQ
S3
= Enable secondary section, HQ free
S4
= Enable main section, HQ free
S5
= HQ down (Z2)
Y1
= Main section VE (Z1)
Y2
= HQ up (Z2)
Y3
= HQ down (Z2)
Y4
= Extend DA damper (Z4)
A1
= Straight-ahead signal
Note:
• Central position (WT 4 stop position) of HQ 4 is centered by springs (without
pressurization)
• Distance Z1–Z3 = l
+ 200 mm
WT
• Distance S2–S3 = min. 200 mm
Z2
≥1
1N1
S3
1N2
S4
1N3
1N4
1N5
1N6
1N7
3 842 558 544/2017-07, MIT: HQ 5/H, HQ 5/XH, Bosch Rexroth AG
Appendix
57/60
1
2
S1
S2
S3
S4
A1
NS
Y1 (Z1)
NS Y4 (Z4)
S1
1
S2
NS
D
T2
T2
F
NS Y2 (Z2)
S4
S Y3 (Z2)
R Y3 (Z2)
S3
A1
NS Y3 (Z2)
S3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth hq 5/xh

Table of Contents