Test Completion - GE Dash D 0 0005 G Series Service Manual

Port docking station
Table of Contents

Advertisement

Test Completion

3-16
Maintenance: Electrical Safety Tests
6. Read the leakage current indicated on the DMM.
If the reading is greater than the appropriate specification below, the
device under test fails this test and should be repaired and tested
again.
10 µA (0.01 volts on the DMM) at 120 VAC without the patient
cable.
20 µA (0.02 volts on the DMM) at 240 VAC without the patient
cable.
127(
The 10 and 20 µA limits are based on internal design
standards.
50 µA (0.05 volts on the DMM) at 120-240 VAC with the patient
cable.
127(
The 50 µA limit is common to all standards. AAMI ES-1
standard requires using the patient cable.
7. Set the power switch on the leakage tester to OFF.
8. Repeat all previous steps for the TEMP/CO connector using the
appropriate test body.
Disconnect all test equipment from the device. Disconnect the device
power cord plug from the leakage tester power receptacle. Disconnect the
leakage tester from the wall receptacle.
Dash Port Docking Station
2000966-037
GND
Revision B

Advertisement

Table of Contents
loading

Table of Contents