Check Before Operation; Starting; Stopping - Toshiba V Series User Manual

Admap-5m an712 module
Hide thumbs Also See for V Series:
Table of Contents

Advertisement

Chapter 4 Operation

4.1 Check Before Operation

4

4.2 Starting

4.3 Stopping

22
Before switching power on and starting the product, check the switch settings, installation
and wiring again that they conform to the instructions given in the Process LAN ADMAP
Installation and Wiring Manual (6F8C0479).
(1) Checking the switch settings: Check the settings of the station address setting
switches and operation mode setting switches.
(2) Wiring check: Check the wiring, referring to the Process LAN ADMAP Installation
and Wiring Manual (6F8C0479).
The system starts operating automatically when power is switched on.
When the EN7 modules start, check that they are operating normally, referring to Table
2-1, Status LEDs.
If the modules fail to start, or if their operation is not normal, stop use and contact the
nearest Toshiba service office.
Operation stops when power is switched off.
model 3000 ADMAP-5M AN712 Module User's Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

3000

Table of Contents