GE LOGIQ E9 Service Manual page 405

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-75
3.
The R5 and later Arm Assembly Cable
route in the same manner as R4.
R5 has a has a ground Cable for the Arm.
R6 and later has no ground Cable for the
Arm.
Take the Monitor Arm and Cables and feed
the Power Cable into the Adapter first.
Position the Video Cable Connector as
shown and continue to feed the cables into
the Adapter.
Install the Arm Assembly.
R6 and later:
Route the Cables into the Adapter one at a
time.
4.
Position the Arm Assembly so the Set
Screw mounting hole faces the left side of
the LOGIQ E9.
Install the Set Screw. Torque: 9.8 Nm
(7.2 lbf-ft {86.4 lbf-in}).
. 2
EV
Monitor Arm assembly (Ergotron) installation - R5 and later production
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
R5 shown
M
ANUAL
8 - 121

Advertisement

Table of Contents
loading

Table of Contents