GE LOGIQ E9 Service Manual page 235

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
7-5-8-1
Digital Receive (cont'd)
Name: Nathan MLA Data Alignment Test
Description: Output TVG of Nathan with system configured for max number of MLAs supported by
system. Each MLA gain is set differently to detect MLA ordering problems. Verifies the alignment (16
identical samples in a row) of IF to GFI.
Run Time: 00:05
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
2.) Replace any failed DRX boards.
. 2
EV
Chapter 7 Diagnostics/Troubleshooting
LOGIQ E9 S
M
ERVICE
ANUAL
7 - 33

Advertisement

Table of Contents
loading

Table of Contents