Specifications; Preparations For Software Downloading - GE FVP110 Maintenance Manual

Table of Contents

Advertisement

GE Energy

Specifications

Steady-state current: Max. 17 mA
Current Draw (Steady-state): 17mA (max)
Current Draw (Software Download state): 24mA (max)
Current during FlashROM blanking time: Max. 24 mA additional to steady-state current
Based on Fieldbus Foundation Specification Download class: Class 1

Preparations for Software Downloading

For software downloading, you need to prepare the following:
Software download tool
Software for downloading file for each of the target field devices
For the software download tool, use only a program developed for that purpose. For
details, see the software's User's Manual.
The download tool cannot execute downloading during other system connects to the
system/network management VFD of the device.
Class 1 devices can continue the specified measurement and/
NOTE
or control actions even while software is being downloaded to
them. On completion of a download, however, the devices are
reset internally to make the new, downloaded software take
effect, and this halts fieldbus communication and function
block executions for about one minute.
Do not hook up the software download tool to a fieldbus
CAUTION
segment while the plant is in operation, as it may temporarily
disturb the communication. Always connect the tool before
starting operation.
FVP 110 Fieldbus Valve Positioner Manual
240

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents