Step 3 Remove the CIM.
1.
2.
Step 4 Install a CIM.
1.
2.
Step 5 Reconnect cables to the CIM based on the cable labels.
Step 6 After the installation is complete, perform networking by referring to
Commissioning CIMs and
----End

4.5.3.3 Replacing a BIM

A BIM needs to be replaced when it is faulty or fails in communication. If multiple BIMs
need to be replaced, replace them in ascending order based on battery numbers in the range of
0–300.
Procedure
Step 1 Press the CIM networking switch for 2 seconds. The RF_Z indicator on the CIM changes
from blinking green at long intervals to blinking green at super short intervals, which
indicates that the CIM is being networked.
Step 2 Remove the faulty BIM from the battery.
Issue 07 (2019-12-20)
If multiple CIMs are cascaded, remove all cables and label them.
Disconnect the cable from the HALL current monitoring port.
Remove the CIM from the fastener, as shown in
Figure 4-15 Removing a CIM
Record the DIP switch address of the CIM.
Clamp the CIM to the fastener.
Set the DIP switch for the CIM based on the recorded information. If DIP switch settings
are required for multiple CIMs in the system, refer to iBAT 2.0-CIM01C2 User Manual
for the setting rules.