Connections

Connection Overview

Battery
WARNING
y Electrical shock hazard. Do not touch uninsulated wires when the PCS cover is removed.
y Before starting electrical cable connections or removing the cover, turn off the AC circuit breaker, PV switch
and DC circuit breaker of the battery. (In case of re-installation, turn them off and wait at least 10-minute
standby period of time for complete discharge within this product.)
y When the photovoltaic array is exposed to light, it supplies a DC voltage to the PCS.
CAUTION
y The electrical installation of these PCS and battery must only be performed by electricians or technicians,
qualiied to install PCS and battery.
y When removing the cover, make sure not to damage internal components.
PV Array 1
PV Array 2
Installation
Power Grid
Smart Meter
Internet