GE 350 Communications Manual page 111

Protective relay platform
Hide thumbs Also See for 350:
Table of Contents

Advertisement

CHAPTER 4: 3 SERIES IEC61850 GOOSE
SR3 SERIES PROTECTIVE RELAY PLATFORM – COMMUNICATIONS GUIDE
To build the content of the GOOSE transmission proceed as follows:
2.8.
Within the dataset sources work area, open the directory tree of the IED labeled
"one" to expose the logical nodes.
2.9.
To transmit the status of Virtual Input 1 which is contained within logical node
GGIO3, open the directory of logical node GGIO3 to view indication one.
2.10. Within indication one status bit sval will contain the status of Virtual Input 1.
Once visible, left-click and drag the status value (sVal) of indication one into the
data sets elements list.
2.11. Select Save and once saved, you will see a confirmation message appear on
the computer screen.
3.
Configure relay 254's GOOSE reception.
The next step is to export relay 228's modified CID file to the computer such that the
structure of GOOSE message TX1 can be used to configure the structure of the
reception within relay 254. Within the 3 Series relays, the CID file settings are resident
in both the on-line and off-line memory area of the relay. The EnerVista 3 Series
Setup software modifies the CID file settings located in the off-line area while loading,
running the CID settings that were present at power-up. Only at power-up are the off-
line CID file settings loaded into the on-line memory area in order for them to take
effect. Given that the EnerVista 3 Series Setup software exports only the on-line CID
file, the power to relay 228 must first be cycled before the file can be exported.
USING THE IEC 61850 CONFIGURATOR
4-39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

339345

Table of Contents