Power-On And Commissioning; Powering On The Smart Pcs - Huawei LUNA2000-200KTL-H1 User Manual

Smart power control system
Table of Contents

Advertisement

LUNA2000-200KTL-H1 Smart Power Control System
User Manual

7.1 Powering on the Smart PCS

Precautions
Ensure that all the items in
the requirements before power-on.
● Wear personal protective equipment and use dedicated insulated tools to avoid
● Before turning on the AC switch between the Smart PCS and the power grid,
● Before the equipment is put into operation for the first time, ensure that the
● If the Smart PCS has not been used for six months or longer after being
Issue 08 (2024-01-23)
7

Power-On and Commissioning

The Smart PCS can be commissioned on the SmartLogger WebUI or SUN2000
app. The SmartLogger can manage multiple devices. For details, see the
SmartLogger3000 User
mainly to modify the parameters and upgrade the software version of a single
Smart PCS.
Perform deployment commissioning for the Smart PCS and ESS together. For
details, see the
LUNA2000-2.0MWH Series Smart String ESS User
D ANGER
electric shocks or short circuits.
NO TICE
check whether the AC voltage is within the allowed range using a multimeter.
(See the local power grid standard.)
parameters are set correctly by professional personnel. Incorrect parameter
settings may result in noncompliance with local grid connection requirements
and affect the normal operations of the equipment.
installed, it must be checked and tested by professionals before operation.
Copyright © Huawei Technologies Co., Ltd.
Manual. The app is used for local commissioning,
6 Checking Before Power-On
7 Power-On and Commissioning
are checked and meet
Manual.