HP 8082A Operating And Service Manual page 40

Table of Contents

Advertisement

Table 5-10. Performance Check - Transition Time
I
STEP
4 D E L A Y
8
AMPLITUDE
10 TRANSITION
11
VERNIER
Adjust the width vernier for 50% duty cycle.
Adjust the scope for a full screen display, set to Expand
and centre the leading edge of the pulse on the display.
Measure transition time between
19% and 99% points.
transition time between 19%
Repeat 1 to 4 with NEGiPOS switch (26) in NEG posi-
tion.
Repeat 1 to 4 with h;>RM/COMPL
COMPL.
PERFORMANCE CHECKS
c w
c c w
and 90% <
switch (19) set to
Table 5-l 1. Performance Check - Pre-shoot, Overshoot,
Rining and Linearity
STEP
TRANSITION
TIME 5n-59n
SWITCH NORM
Adjust width vernier for a 59% duty cycle and 8 div
vertically.
Adjust leading vernier 11 and trailing vernier 12 for
Measure, with reference to diagrams below, preshoot,
overshoot, rirging and linearity.
Preshoot
J
-
4
5
Repeat with the NEG/POS switch MI) set to NEG.
6
Repeat with the NORMKOMPL
deviation from a straight line
the 10% and 96%
points should not excead 5%
of the peak voltage.
switch (191 set to

Advertisement

Table of Contents
loading

Table of Contents