(4) Installation on concrete, brick or tiled wall.
1 Make the Wall Plug hole in the wall by mean of a drill.
2 Drive a Wall Plug into the hole.
3 Drive each Screw into the upper Wall Plugs through the Screw Holes on the set.
After tighten up the two upper Screws, tighten up the remaining two Screws.
4 Please ensure the set screwed tightly on wall by shaking it left and right.
(Note: The set must be mounted with 4 Screws).
(4) 裝置在混凝土,火磚,瓷磚等牆壁。
1 使用鑽頭把混凝土用螺拴的孔位置打穿。
2 把螺拴打入混凝土裡面。
3 通過機體上兩個螺絲洞把木螺絲扭進混凝土里面的螺拴,並將之扭緊。之後將其餘的個螺絲扭緊。
4 將機體向左右搖擺以確保機體穩定地裝置在牆上。(注:機體必須用4枚螺絲裝置。)
25mm
25毫米
Drill
打穿
6mm
6毫米
(5) Proceed the piping installation procedure (see page 12) and electric wiring (see page 13) as illustrated.
(5) 進行'水道管安裝法'(第12頁)及'電氣工程'指導(第13頁)。
(6) Close the Front Plate
1 Make sure the Power Selector Knob on Front Plate and "D-Cut" at OFF position.
2 Close the Front Plate of the unit according to the sequence as illustrated.
(6) 蓋上機箱
1 確保調電量調整鈕在機箱上而"D-Cut"是處於OFF的狀態。
2 依照如圖所示的順序將機箱蓋上。
Wall Plug
螺拴
Front Plate
機箱
ELB
OFF Position
OFF狀態
POWER SELECTOR
SUPER POWER
MULTI POINT
Back Plate
ELB CHECKER
RESET PUSH UP
後箱
Press
按
Front Plate
機箱
Back Plate
後箱
- 11 -
Screw
Wall
螺絲
牆壁
Wall Plug
螺拴
"D-Cut" Position
"D-Cut"狀態
WARNING
L(+)
(-)N
MUST BE TIGHTNED
(1Nm)
Press the Power Selector Knob
按下電量調整鈕
Wall
牆壁
Wall Plug
螺拴