SICHARGE UC Charger

3.1

Pre-Installation

Control (annually)
Customer:
Serial number:
Location:
-
Planning
No.
1
Access to the latest version of the operating manual is guaranteed
2
Access to the latest version of the UC Installation manual is guaranteed
3
the commission technician has the proper training and knowledge to do the installation action
4
Access to the latest version of the UC installation Log (editable version) is guaranteed
5
A previous reading to the installation Log was made
6
Access to the latest version of the customer's electrical diagram for the system to be installed is
guaranteed
7
The customer's electrical diagram is applicable to the charging system to be installed
8
In case of a system with multiple dispensers, it is known the priority sequence to be used in the
charger configuration
9
Access to customer data required to complete the installation log is guaranteed
10
Access of installation team to the important contacts (Customer, Customer support, installation
responsible, project manager...) for the installation action is guaranteed.
11
Access to a Forklift or crane is guaranteed
12
Access to all tools needed is guaranteed
13
Access to all fastenings needed is guaranteed
14
Connections to be made between charger and dispenser are known and listed
15
Connections to be made between chargers are known and listed
16
Connections to be made between charger and grid are known and listed
17
Connections to be made between charger and costumer communication system are known and
listed
6
Date:
Date of manufacture:
Name:
-
Checklist item
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
3
P
F
N/A