Download Print this page

GE ArcamEBM Spectra H Operation Manual page 56

Hide thumbs Also See for ArcamEBM Spectra H:

Advertisement

6 6 . . 4 4 . . 4 4 B B u u i i l l d d U U n n i i t t , , R R e e m m o o v v a a b b l l e e P P a a r r t t s s
1. Column protection foil
2. Metallisation cone
3. Heat shield
4. Heat shield, 2nd layer
5. Powder hopper
6. Build tank
7. Top heat shields
52
Parts of the build unit which require to be handled
by the operator when reloading the EBM Machine.
C C o o l l u u m m n n p p r r o o t t e e c c t t i i o o n n f f o o i i l l a a n n d d c c o o n n e e
Acts as a grounding reference for the magnetic
lenses and to prevent static buildup in the ceramic
components and cause beam control errors.
H H e e a a t t s s h h i i e e l l d d
The heat shield helps to maintain the temperature
of the build and protects internal parts from metalli-
sation. The heat shield is also used as part of the
X-radiation protection.
H H e e a a t t s s h h i i e e l l d d 2 2
n n d d
l l a a y y e e r r
Helps to maintain the temperature of the build. The
2
nd
layer heat shield is attached to the brackets in
the chamber ceiling
P P o o w w d d e e r r h h o o p p p p e e r r s s
Always use the loading trolley when moving the
hoppers in and out of the build chamber.
The hopper outlet is equipped with an automatic
shut-off valve eliminating the risk of powder spilling
when removing the hoppers from the chamber.
B B u u i i l l d d T T a a n n k k
Removable build tank, including build table, to al-
low an efficient reload of the EBM Machine.
02
OM-710430
en-GB

Advertisement

loading