Replacing The Interface Board Of The Centralized Monitoring Module - Huawei FusionPower6000 Maintenance Manual

Hide thumbs Also See for FusionPower6000:
Table of Contents

Advertisement

FusionPower6000
Maintenance Guide
Step 5 Check the parameters and communication status of the smart ETH gateway to
ensure normal communication.
----End
6.6 Replacing the Interface Board of the Centralized
Monitoring Module
Prerequisites
When short-circuiting and restoring the terminals of the current transformer, wear
insulated gloves and do not touch conductors.
Procedure
Step 1 If you need to replace the interface board of the centralized monitoring module in
the cable inlet and bus tie cabinet (combined or separated) or maintenance
bypass cabinet, locate the terminals of the current transformer based on the
electrical diagram and labels. Record them and short-circuit the secondary circuit
and PE of the current transformer using a short-circuiting bar to avoid electric
shocks caused by the secondary circuit if it is open.
If the terminals of the current transformer are not short-circuited before the
interface board of the centralized monitoring module is replaced with power on,
the new interface board of the centralized monitoring module will be damaged
and electric shocks may occur.
Figure 6-9 Short-circuiting terminals (1)
Issue 02 (2022-07-18)
D ANGER
Tools: insulated gloves, ESD wrist strap, ESD gloves, Phillips screwdriver, label,
marker
Material: a new and intact interface board of the same model for the
centralized monitoring module
D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Component Replacement
48