3. Installation Place

4. Installation Environment

For Primaide Series system installation, it is required to provide a
space of 980 mm in width, and 550 mm in depth at least.
A space of 150 mm or more in width shall be provided on the
rear side of the instrument, and a space of 100 mm or more in
width shall be provided on each of the left and right sides of the
instrument.
Prepare a level, sturdy installation table capable of bearing a
load of at least 150 kg.
In an example of a total system arrangement, Primaide
organizer, Primaide 1110 pump, Primaide 1210 autosampler,
Primaide 1310 column oven, and Primaide 1440 fluorescence
detector, stacked in two blocks, are included.
Check and prepare an installation place satisfying the space
requirements for your actual system and OA equipment to be
used in combination.
The following environmental conditions must be satisfied.
(1)
Operating Ambient Temperature
Within a range of 4 to 35 C. And temperature variation
should be minimum during measurement. Also, be careful
not to allow condensation to form.
(2)
Operating Ambient Humidity
25 to 85% RH
(3)
Atmospheric Gas
(a) There should be adequate ventilation.
(b) Should be no acidic, alkaline or other gas that would
highly corrode metal.
(c) Should be free from organic solvent gases (especially
benzene, paint thinner) that would dissolve the painted
surfaces of the instrument.